MGBW Dock System Design-Install
In 2014 The Marine Group suffered extensive damage to its dockside pier system drastically effecting its ability to operate. PTS once again through its innovative thinking was able to convert barges into a viable dock system that has enhanced the National City operation by adding an upgraded mooring system that expands the services to customers while sitting shoreside at the facility.